Major Mines Projects | Galalar Project
The average depth of the sand to be mined is greater than 15m and the average area to be prepared for mining averages less than four hectares per year. The exposed silica ore will be excavated using a front end loader and loaded directly into a hopperfeeder unit at a rate of 138t per hour for hours per day and 360 days per year.